MRT Corp was established in 2011 and is fully owned by the Minister of Finance (Incorporated). In 2017, MRT Corp successfully delivered the country’s first MRT line, MRT Kajang Line. This is followed by the MRT Putrajaya Line which was successfully delivered in 2023.
MRT Corp has also been appointed as the Malaysian InfraCo for the Rapid Transit System (RTS) Link Project between Johor Bahru and Singapore. The full opening of the line is targeted to be on 31 December 2026.
MRT Corp also plans and designs future metro rail networks and strive to be the catalyst in urban socio-economic regeneration by way of inclusive metro rail transport system and development of transit-oriented communities